Open and Upcoming Procurements
Click here to access our vendor portal.
Planned Procurements:
Metrolink Projects
Project Name | Scope Description | Timeframe |
SCORE Chatsworth Station Improvement | New pedestrian underpass at the station will allow the elimination of signal hold-out rule which impacts train movements through the station | 2023 |
SCORE Marengo Siding Extension | Extend existing Marengo Siding by 3,300 ft to facilitate train-meets before entering single track in the constrained railroad right-of-way. | 2024 |
SCORE El Monte Siding Extension | Pedestrian grade crossing improvements at the station and at Tyler Ave, and a siding extension east of the station with a bridge over Ramona Blvd. | 2023 |
SCORE Rancho Cucamonga Siding Extension | Extension of the existing siding track by 4,600 feet west. Pedestrian safety improvements to at-grade crossings at Hellman Ave and Archibald Ave, new track panels at the grade crossings, extension of drainage culverts, and railroad signal modifications. | 2023 |
SCORE Simi Valley Double Track | New second track and platform through Simi Valley Station, pedestrian underpass along with grade crossing improvements at four at-grade crossings. Special trackwork and signals improvements. | 2023 |
SCORE Cogswell Road At-Grade Crossing |
Add pedestrian gates, pedestrian channelization, emergency swing gates, and provide sidewalk/track ADA updates. Resurface streets, install pavement markings and signage, extend medians, relocate existing driveway, signalize an intersection, provide advance traffic signal preemption, and modify the railroad crossing warning system. |
2024 |
SCORE Balboa Double Track Extension | Construct a second track to form a double track section from CP Balboa to Sierra Highway for approximately 1.2 miles. | 2024 |
San Juan Bridge Replacement | New bridge across Creek with main line track then realigned onto new structure. Demolition of old bridge superstructure. | TBD |
SCORE Orange County Maintenance Facility | Initial phase of the Orange County Maintenance Facility in Irvine which includes storage tracks, service and inspection tracks, utilities, and civil roadway work. | 2023 |
SCORE Canyon Siding Extension | Construct a second track from CP Canyon to Golden Oak Road for approximately 1.6 miles and, add a second platorm at Santa Clarita Station. | 2025 |
SCORE Lancaster Terminal Improvements | Expansion by adding two storage tracks and a second platform, in addition to at-grade improvements and quiet zone ready improvements. | 2025 |
Procure New Portable Generator | Procure new trailerized portable generator for C&S system support and emergency response | TBD |
Passenger Railcar Restroom Mirrors | Procurement of standard size mirrors for passenger railcar restrooms | TBD |
Communication and Signal Equipment and Materials | Establish a Blanket Purchase Agreement for various communications and signal equipment and materials |
2023 |
Four Rural Bridges - Arroyo Simi Scour Protection | Construction Contract for Scour prevention for the 4 Arroyo Simi Bridges | 2023 |
Arroyo Seco Bridge Deck Replacement | Construction Contract for the replacement of the Bridge Deck on the Arroyo Seco Bridge | 2023 |
Survey On-Call | Survey and PTC Support Bench | 2023 |
Signal Design On-Call | Signal, PTC and Comms Design Bench | TBD |